3/20/07 The beginning of A LOT of Drywall!

 

3/24/07

4/14/07
The new sanctuary roof was dried in, and the existing church, nursery school and pavilion were re-shingled this week. Siding arrived and is being painted before being installed , more interior drywall installed, work on the soffit & cupola began

 

4/21/07

4/28/07
Fire storage tanks, cupola panels, drywall, window framing, soffit, color samples

12

34

The models above were the color choices given to the congregation by the decorating committee. The winner was #2.

5/2/07

5/5/07

5/9/07