3/20/07 The beginning of A LOT of Drywall!


3/24/07











4/14/07
The new sanctuary roof was dried in, and the existing church, nursery school and pavilion were re-shingled this week. Siding arrived and is being painted before being installed , more interior drywall installed, work on the soffit & cupola began







4/21/07







4/28/07
Fire storage tanks, cupola panels, drywall, window framing, soffit, color samples













1
2
3
4
The models above were the color choices given to the congregation by the decorating committee. The winner was #2.
5/2/07


5/5/07















5/9/07